Measure each floor
A plot is not the same as permitted built-up area. Enter proposed floor areas from your drawings, with setbacks checked separately.
Call Us+91 88751 11103Schedule a Site VisitConstruction · FREE
Build an itemized planning budget from your own area, labour and material assumptions.
Complete the inputs to see your result and assumptions. No login or contact details required.
UNDERSTAND YOUR RESULT
Start with floor areas, then separate materials, labour and finishes. Use your own quotations to explore a budget, not a construction offer.
A plot is not the same as permitted built-up area. Enter proposed floor areas from your drawings, with setbacks checked separately.
Separate materials, labour, MEP and finishing. An item already included in a package must not be added again as a standalone material cost.
Change one finish or rate assumption at a time. Land, statutory approvals, finance and taxes belong in separate budget lines.
100 m² · one floor. Use the example button in the calculator to apply these editable inputs.
Illustrative measurements or assumptions only; not an approved design, quote or offer.
Confirm measurements, inclusions and price assumptions. These planning results do not replace professional engineering, legal or lender advice.
Results retain the assumptions you selected. Compare like-for-like areas and avoid counting the same item twice.
A = sum(proposed floor areas), or uniform area × floors. Cost = A × sum(supplied component rates) + separate parking/balcony allowances; contingency applies once. Missing rates yield no monetary total.
Currency totals: 2 decimal places; geometry and quantities: 6. Whole units/boxes round upward with floating-point ULP correction; internal calculation precision is retained.
Formula 2.0.0 · Content/schema 2
References last checked 2026-10-29. This is not certification of a fee schedule or property.
A plot is not the same as permitted built-up area. Enter proposed floor areas from your drawings, with setbacks checked separately.
Separate materials, labour, MEP and finishing. An item already included in a package must not be added again as a standalone material cost.
Change one finish or rate assumption at a time. Land, statutory approvals, finance and taxes belong in separate budget lines.
Yes. PDF and comparisons are free. Saving a report is optional and needs consent; a calculation needs no contact details.
YOUR NEXT PROPERTY STEP
Explore RUDAAR properties and interior options while keeping land and building budgets separate.